Guides on construction site signage and permits

Concrete answers to the questions contractors and construction and renovation companies ask us, from the public domain occupancy permit to SB250 compliance and avoiding municipal administrative fines.

Medewerker van Werfsignalisatie.be die een parkeerverbodsbord draagt in een stadsstraat

Putting up your own parking signs: a summary of the rules

If you are putting up the parking signs yourself, you must position them exactly as specified in your permit: one set per 25 metres, with the start sign showing the arrow pointing upwards, the end sign showing the arrow pointing downwards, and the dates and times on the lower panels. Take photographs whilst performing the installation and send these, together with the number plates of the cars already parked there, to the police and the municipality.

Read more →

Applying for a public domain occupancy permit: how it works

For works or a container on the pavement, parking strip or roadway you need a public domain occupancy permit. You apply for it per municipality via EagleBE, Spotbooking or the city's occupancy form. Expect a processing time of a few working days to two weeks. We take the entire application off your hands.

Read more →

What does it cost to rent construction site signage?

Renting construction site signage starts from around €40 incl. 21% VAT. The exact price depends on the type and number of signs, the rental period and whether you want delivery, installation and collection. For contractors we work on a project basis with fixed terms.

Read more →

Applying for a no-parking zone for your move or construction site

For a move, a delivery or a construction site, you reserve a parking space with a temporary no-parking zone. You apply for the public domain occupancy permit with the municipality (via EagleBE, Spotbooking or the occupancy form) and put up E1/E3 no-parking signs in good time. Expect a processing time of a few working days.

Read more →

Renting site fences (Heras fences): when do you need them?

Site fences (often called Heras fences) close off your construction site safely and keep unauthorised people out. You rent them per panel with concrete feet and coupling clamps, and place them on your own land or, with a permit, on the public domain. For shorter or lighter cordons, barriers or crowd control barriers are the better choice.

Read more →

Crowd control barriers: what do you use them for?

Crowd control barriers are the classic movable barriers that guide pedestrians and traffic alongside or around a site zone. You use them for temporary cordons, a safe pedestrian walkway and events. For a complete, secured site enclosure, site fences are the better choice.

Read more →

Working on a regional road: when is AWV in charge?

If your construction site is on a regional road (a numbered N road or a motorway), the Agentschap Wegen en Verkeer (AWV) is the road authority in Flanders. You usually still apply for the occupancy through the municipality, but AWV issues advice or approval and sets stricter requirements for your signage. On municipal roads, the municipality itself is in charge.

Read more →

How long does a public domain occupancy permit take?

Count on a few working days to around two weeks of processing time for a public domain occupancy permit, depending on the municipality, the size of your occupancy and whether a signage plan is needed. So submit your application well in advance. You will find the indicative time frame per municipality on our municipality pages.

Read more →

Aerial work platform or crane on the public road: permit and signage

If you place an aerial work platform, telehandler or crane on the pavement, a parking bay or the carriageway, you need a public domain occupancy permit as well as compliant signage to cordon off the zone. Occupying a traffic lane usually calls for a signage plan. We apply for the occupancy and deliver the signs and barriers with it.

Read more →

What is EagleBE and how does an application work?

EagleBE is the online platform many Flemish cities and municipalities use to handle applications for occupying the public domain. You submit your application digitally with the location, the period and the type of occupancy, after which the municipality assesses it. We submit the application via EagleBE entirely for you.

Read more →

SB250: What is compliant construction site signage and why is it important?

SB250 is Standaardbestek 250 for road construction: the technical standard with which temporary construction site signage must comply in terms of dimensions, retroreflectivity and colour. It is directly binding on you when it has been declared applicable to your contract; on a standard roadworks site, the highway code and the Ministerial Decree of 7 May 1999 apply. All our equipment complies with SB250.

Read more →

The highway code on your construction site: which rules actually apply?

Construction site signage in Flanders and Brussels is based on two pieces of legislation: Article 78 of the Royal Decree of 1 December 1975 sets out who is responsible for erecting signage and who authorises it, whilst the Ministerial Decree of 7 May 1999 specifies what that signage must look like. Below are the articles in full, with references, and what they mean in practical terms for your construction site.

Read more →

From plan to practice

The signs these articles are about

A diversion or roadworks area on the carriageway consists of fixed building blocks. This is the material that is dispatched from our depot for this purpose.

Get in touch with our team

Quickly arranged, safely installed.

Private customer? Calculate your price straight away and order online via the webshop.

Professional? Get in touch for project-based solutions and B2B rates.

Deliveries
Monday - Friday
Pick up & return yourself
Monday - Saturday

What you can expect from us

  • Quotes for professionalswithin 2 working days
  • Delivery or pick-upafter timely reservation
  • Phone, urgent matters onlyMonday to Friday 09:00 - 12:00

Discover our B2B terms for SMEs in the construction sector.