Test environment

This is the new site under construction, not the live site. Orders and payments are not processed here.

Additional panels

Traffic sign M2: Except cyclists

The M2 panel hangs below a sign such as C3 or C1 and means the restriction does not apply to cyclists.

Traffic sign M2: Except cyclists
Code
M2
Type
Additional panelsHighway Code, art. 65
Official description
Additional panel: except cyclists

What does the M2 sign mean?

The M2 panel hangs below a sign such as C3 or C1 and means the restriction does not apply to cyclists. At roadworks it lets cyclists through a closed street where a safe passage remains for them.

Additional panels: what you need to know

Additional panels hang below another traffic sign and complete, specify or limit it (Highway Code, art. 65.2). The M panels, with black lettering on white, make an exception for cyclists or moped riders.

Do you need a permit?

An additional panel always hangs below another traffic sign and so follows the same consent as that sign: the occupation or signage permit for your worksite.

Permits by municipalityHave a signage plan drawn up

Rent the M2 sign

All our signs are SB250-compliant. Pick them up yourself in Drongen, or have them delivered, placed and collected.

All signage for rent

Frequently asked questions about the M2 sign

What does traffic sign M2 mean?
Additional panel: except cyclists. The M2 panel hangs below a sign such as C3 or C1 and means the restriction does not apply to cyclists. At roadworks it lets cyclists through a closed street where a safe passage remains for them.
Can I rent a M2 sign?
Yes. You can rent the M2 sign from Werfsignalisatie.be from €20.50 incl. VAT. Pick it up yourself in Drongen, or have it delivered, placed and collected.
Do I need a permit for a M2 sign?
An additional panel always hangs below another traffic sign and so follows the same consent as that sign: the occupation or signage permit for your worksite.

Other additional panels

The other signs in this category that you can rent from us.

All traffic signs

The official description comes from the Belgian Highway Code (Royal Decree of 1 December 1975).

Get in touch with our team

Quickly arranged, safely installed.

Private customer? Calculate your price straight away and order online via the webshop.

Professional? Get in touch for project-based solutions and B2B rates.

Deliveries
Monday - Friday
Pick up & return yourself
Monday - Saturday

What you can expect from us

  • Quotes for professionalswithin 2 working days
  • Delivery or pick-upafter timely reservation
  • Phone, urgent matters onlyMonday to Friday 09:00 - 12:00

Discover our B2B terms for SMEs in the construction sector.