Test environment

This is the new site under construction, not the live site. Orders and payments are not processed here.

Warning signs

Traffic sign A31: Roadworks

The A31 sign announces works on or beside the public road.

Traffic sign A31: Roadworks
Code
A31
Type
Warning signsHighway Code, art. 66
Official description
Roadworks

What does the A31 sign mean?

The A31 sign announces works on or beside the public road. It is the basic sign of any worksite signage: it stands before the works zone, normally about 150 metres ahead, and the end of the zone is marked with the F47 "end of roadworks" sign.

Warning signs: what you need to know

Warning signs are triangular with a red border. They warn of a hazard ahead and are normally placed about 150 metres before it (Highway Code, art. 66.2). On a worksite they announce what the driver is about to meet: roadworks, a narrowing, an uneven surface.

Do you need a permit?

Anyone who puts up a traffic sign on the public road for works needs the consent of the road authority: through the occupation permit or through a signage permit with a signage plan. Without that consent you may not put up the sign.

Permits by municipalityHave a signage plan drawn up

Rent the A31 sign

All our signs are SB250-compliant. Pick them up yourself in Drongen, or have them delivered, placed and collected.

All signage for rent

Frequently asked questions about the A31 sign

What does traffic sign A31 mean?
Roadworks. The A31 sign announces works on or beside the public road. It is the basic sign of any worksite signage: it stands before the works zone, normally about 150 metres ahead, and the end of the zone is marked with the F47 "end of roadworks" sign.
Can I rent a A31 sign?
Yes. You can rent the A31 sign from Werfsignalisatie.be from €20.50 incl. VAT. Pick it up yourself in Drongen, or have it delivered, placed and collected.
Do I need a permit for a A31 sign?
Anyone who puts up a traffic sign on the public road for works needs the consent of the road authority: through the occupation permit or through a signage permit with a signage plan. Without that consent you may not put up the sign.

Other warning signs

The other signs in this category that you can rent from us.

All traffic signs

The official description comes from the Belgian Highway Code (Royal Decree of 1 December 1975).

Get in touch with our team

Quickly arranged, safely installed.

Private customer? Calculate your price straight away and order online via the webshop.

Professional? Get in touch for project-based solutions and B2B rates.

Deliveries
Monday - Friday
Pick up & return yourself
Monday - Saturday

What you can expect from us

  • Quotes for professionalswithin 2 working days
  • Delivery or pick-upafter timely reservation
  • Phone, urgent matters onlyMonday to Friday 09:00 - 12:00

Discover our B2B terms for SMEs in the construction sector.