Test environment

This is the new site under construction, not the live site. Orders and payments are not processed here.

East Flanders

Public domain occupancy permit in Lede

For work on the public domain in Lede (East Flanders) you apply for an occupancy permit via EagleBE, with an indicative processing time of about 8 days. We take that application completely off your hands and align it with your construction site signage.

Parkeerverbodsbord met de vergunde periode erop geschreven, voor een rij geparkeerde auto’s
Application platform
EagleBE, application page
Processing time
± 8 days
Cost / fee
The tax follows from the municipal regulation on the private use of the public domain. For an urgent procedure you pay €15 on top of the standard tax.

We handle the permit application for contractors and construction and renovation companies; private customers rent the signage from us and apply for the permit themselves at the municipality.

Procedure in Lede

In Lede you apply for the occupancy via EagleBE's online platform, at least 8 days before the occupancy. Important for contractors: you are required to add a signage plan to your application. Private customers are not.

How the application works in Lede

  • Submit at least 8 days before the occupancy via EagleBE.
  • Contractors are required to add a signage plan.
  • Urgent procedure: no later than 3 working days in advance, with €15 extra.
  • If you close a street or a footpath, you submit 14 days in advance.

Points of attention

  • Contractors are required to add a signage plan.
  • Closing a street or footpath: 14 days in advance.
  • Urgent procedure up to 3 working days in advance, at €15 extra.

Frequently asked questions about the permit in Lede

Do I need a permit in Lede for work on the public domain?
Yes. If your work takes up (part of) the carriageway, a parking lane or the pavement, you need a public domain occupancy permit in Lede. If you work entirely on your own property, you don't.
Where do I apply for the occupancy permit in Lede?
In Lede the application is handled digitally via EagleBE, the online occupancy platform. You'll find the direct application link above under "Application platform"; we can also take the application completely off your hands.
How far in advance do I have to submit the application in Lede?
Expect an indicative processing time of about 8 days. The exact deadline depends on the type of occupancy and the disruption you cause. You can read them above under the procedure. So submit well in advance, so that both the permit and your construction site signage are ready on time.
What does a public domain occupancy cost in Lede?
The tax follows from the municipal regulation on the private use of the public domain. For an urgent procedure you pay €15 on top of the standard tax.
Do I need a signage plan?
As soon as you take up (part of) the carriageway or a parking lane, you usually have to submit a signage plan with compliant signs. The permit determines which signage is required. You rent those signs from us, SB250-compliant.
Can you arrange the permit in Lede for me?
Yes. We submit the application in Lede for you, follow it up and deliver the accompanying construction site signage on site, on time.

Rent the matching construction site signage

The permit dictates which signs you have to place. These are the sets and barriers most often needed for a public domain occupancy in Lede, SB250-compliant, with optional delivery and installation.

View the full rental catalogue

Apply for your permit in Lede

For professionals with a VAT number only. We submit the application, follow it up and let you know as soon as the decision is in.

The site

What are you occupying? More than one answer possible.

The first and last day of the occupancy. These dates go into the application to the municipality as entered.

Attach a signage plan or sketch

For an occupancy with works, the municipality often asks for a signage plan. If you have one, attach it here. If not, we will draw it up.

Up to 5 files of 4 MB. Pdf or photo (jpg, png, heic, webp).

Your request reaches us with all the details, so there is no need to call. Site at a standstill? Then do: 09 278 79 01 (maandag tot vrijdag 09:00 - 12:00).

Also active in East Flanders

Working across several sites? Check the procedure in neighbouring municipalities.

View all municipalities

More about permits

Our knowledge base explains the rules and the procedure step by step.

To the knowledge base

Last checked on 4 augustus 2026.

Get in touch with our team

Quickly arranged, safely installed.

Private customer? Calculate your price straight away and order online via the webshop.

Professional? Get in touch for project-based solutions and B2B rates.

Deliveries
Monday - Friday
Pick up & return yourself
Monday - Saturday

What you can expect from us

  • Quotes for professionalswithin 2 working days
  • Delivery or pick-upafter timely reservation
  • Phone, urgent matters onlyMonday to Friday 09:00 - 12:00

Discover our B2B terms for SMEs in the construction sector.