Public domain occupancy permit in Destelbergen

For work on the public domain in Destelbergen (East Flanders) you apply for an occupancy permit via EagleBE, with an indicative processing time of about 11 days. We take that application completely off your hands and align it with your construction site signage.

Parkeerverbodsbord met de vergunde periode erop geschreven, voor een rij geparkeerde auto’s
Application platform
EagleBE, application page
Processing time
± 11 days
Cost / fee
The first 5 calendar days are free of charge. After that, €0.50 per m² per day applies, with a minimum of €12.50 per declaration (or €5 per container per day). If you submit late, an urgency flat fee of €60 is added on top.

We handle the permit application for contractors and construction and renovation companies; private customers rent the signage from us and apply for the permit themselves at the municipality.

Procedure in Destelbergen

In Destelbergen you submit your application online via EagleBE, at least 11 working days before the occupancy starts. If your construction site is on a regional road (N447 or N445), the application is handled separately via the Agentschap Wegen en Verkeer.

How the application works in Destelbergen

  • Submit at least 11 working days in advance via EagleBE.
  • Late submission is possible, but costs an urgency flat fee of €60.
  • The first 5 calendar days of the occupancy are free of charge.
  • On the N447 and N445 regional roads, the application is handled via the Agentschap Wegen en Verkeer.

Points of attention

  • Submit at least 11 working days in advance; a late application costs a €60 urgency flat fee.
  • The first 5 calendar days are free of charge, after that €0.50/m²/day.
  • Occupancies on the N447 and N445 are handled via the Agentschap Wegen en Verkeer.

Frequently asked questions about the permit in Destelbergen

Do I need a permit in Destelbergen for work on the public domain?
Yes. If your work occupies (part of) the roadway, a parking strip or the pavement, you need a public domain occupancy permit in Destelbergen. If you work entirely on your own site, you don't.
Where do I apply for the occupancy permit in Destelbergen?
In Destelbergen the application is handled online via EagleBE, the online occupancy platform. You'll find the direct application link above under "Application platform"; we can also take the entire application off your hands.
How far in advance do I have to submit the application in Destelbergen?
Allow an indicative period of around 11 days. The exact deadline depends on the type of occupancy and the disruption you cause. You'll find it above under the procedure. So submit well in advance, so that both the permit and your construction site signage are ready in time.
What does occupying the public domain in Destelbergen cost?
The first 5 calendar days are free of charge. After that, €0.50 per m² per day applies, with a minimum of €12.50 per declaration (or €5 per container per day). If you submit late, an urgency flat fee of €60 is added on top.
Do I need a signage plan?
As soon as you occupy (part of) the roadway or a parking strip, you usually have to submit a signage plan with compliant signs. The permit determines which signage is required. You rent those signs from us, SB250-compliant.
Can you arrange the permit in Destelbergen for me?
Yes. We submit the application in Destelbergen for you, follow it up and deliver the accompanying construction site signage on site, on time.

Rent the matching construction site signage

The permit dictates which signs you have to place. These are the sets and barriers most often needed for a public domain occupancy in Destelbergen, SB250-compliant, with optional delivery and installation.

View the full rental catalogue

Apply for your permit in Destelbergen

For professionals with a VAT number only. We submit the application, follow it up and let you know as soon as the decision is in.

The site

What are you occupying? More than one answer possible.

The first and last day of the occupancy. These dates go into the application to the municipality as entered.

Attach a signage plan or sketch

For an occupancy with works, the municipality often asks for a signage plan. If you have one, attach it here. If not, we will draw it up.

Up to 5 files of 4 MB. Pdf or photo (jpg, png, heic, webp).

Your request reaches us with all the details, so there is no need to call. Site at a standstill? Then do: 09 278 79 01 (maandag tot vrijdag 09:00 - 12:00).

Also active in East Flanders

Working across several sites? Check the procedure in neighbouring municipalities.

View all municipalities

More about permits

Our knowledge base explains the rules and the procedure step by step.

To the knowledge base

Last checked on 4 augustus 2026.

Get in touch with our team

Quickly arranged, safely installed.

Private customer? Calculate your price straight away and order online via the webshop.

Professional? Get in touch for project-based solutions and B2B rates.

Deliveries
Monday - Friday
Pick up & return yourself
Monday - Saturday

What you can expect from us

  • Quotes for professionalswithin 2 working days
  • Delivery or pick-upafter timely reservation
  • Phone, urgent matters onlyMonday to Friday 09:00 - 12:00

Discover our B2B terms for SMEs in the construction sector.